You must be a CVU Member to view this resource.
1133 Melville Street
Building
Canceled
Office
LEED Gold Targeted
159.9 m / 525 ft
33
6
287
19
61,194 m² / 658,687 ft²
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
21 June 2019
What was once the site of a multi-level parking garage with a few office levels on the top floors of the structure is now a...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development