You must be a CVU Member to view this resource.
2-3 Finsbury Avenue
Building
Canceled
Office
154 m / 505 ft
33
3
85,378 m² / 919,001 ft²
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
03 September 2019
Danish firm 3XN has won a top-secret design competition to replace two 1980s buildings by Peter Foggo within the City of London’s Broadgate office campus...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development