343 Madison Avenue
341-347 Madison Avenue
Building
Proposed
2028
Office
Composite
LEED Platinum targeted
252.7 m / 829 ft
47
2
23
88,258 m² / 950,001 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
09 August 2022
On 5 August, 2022, developer Boston Properties filed new plans for the building at 343 Madison Avenue. The building's new height is listed at 237.7...
09 August 2022
On 5 August, 2022, developer Boston Properties filed new plans for the building at 343 Madison Avenue. The building's new height is listed at 237.7...
07 May 2021
The majority of 343 Madison Avenue, a proposed 320-meter-tall (1,050-foot-tall) office supertall in Midtown East, will be clad in floor-to-ceiling glass with strips of indented...
30 July 2020
Plans for 343 Madison Avenue in Midtown East unveil the substantial size and scope of the supertall to take the place of the former Metropolitan...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development