You must be a CVU Member to view this resource.
500 Fifth Avenue
Salmon Tower II
Building
Completed
1931
Office
All-Steel
212.5 m / 697 ft
59
17
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development