Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
530 Sansome Street
447 Battery Street
Building
Proposed
2028
Office / Hotel
174.8 m / 573 ft
41
200
60,341 m² / 649,505 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
31 October 2025
San Francisco’s Board of Supervisors has approved plans for a 41-story mixed-use high-rise and new fire station at 447 Battery Street and 530 Sansome Street...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development