You must be a CVU Member to view this resource.
55C
Building
Completed
2024
Residential
All-Concrete
167 m / 548 ft
48
651
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
20 September 2019
Clean architectural lines, indoor rock gardens and a calm decor palette will create a stark contrast to the Yonge and Bloor Street intersection—one of the...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development