You must be a CVU Member to view this resource.
850 North Lake Shore Drive
Lake Shore Athletic Club
Building
Completed
1927
Residential
Hotel
76.8 m / 252 ft
19
1
198
200
Completed
Retrofit Start
Retrofit End
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
17 July 2024
The trend of condo deconversions in Chicago is continuing to shift, as exemplified by two recent proposals in the planned transition of The Hensley apartment...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development