This project was renovated in 1994 and replaced by 99 Bishopsgate (Renovation)
You must be a CVU Member to view this resource.
99 Bishopsgate
Building
Renovated
1976
Office
104 m / 341 ft
26
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development