Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
Aldgate Place, Central Tower
Aldgate Place Phase 2
Building
Proposed
2024
Residential / Office
82 m / 269 ft
26
159
12,635 m² / 136,002 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
13 July 2021
The second phase of Aldgate Place in London is progressing. Located adjacent to Aldgate East and equidistant between Crossrail stations at Liverpool Street and Whitechapel,...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development