Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
Avenida Cordoba 120
Building
Under Construction
2025
Office
LEED Gold targeted
153 m / 502 ft
35
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
14 June 2024
Avenida Cordoba 120 is a 35-story office tower designed by international architecture firm Foster + Partners, and is strategically located at the intersection of Buenos...
14 June 2024
Avenida Cordoba 120 is a 35-story office tower designed by international architecture firm Foster + Partners, and is strategically located at the intersection of Buenos...
05 October 2020
Construction on Avenida Cordoba 120 is underway. The 35-story office tower located at a key junction between the traditional city center and the main entrance...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development