You must be a CVU Member to view this resource.
Beetham Tower
Hilton Tower
Building
Completed
2006
Residential / Hotel
All-Concrete
168.9 m / 554 ft
50
2
219
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
2007 CVU Awards
The creation of an iconic landmark tower on this site was seen as an opportunity to create visual connectivity with the city centre, creating a destination and attracting activity to the south of the centre.
The scheme brings the 24hr activity of a busy hotel to the street with living spaces from studios for young professionals to family dwellings above. Visible from every route into the city, the tower is a statement of Manchester as an urban centre for living, working and relaxing.
The distinctive profile of the tower is created by two simple gestures: The apartment component is articulated by cantilevering the residential accommodation out beyond the hotel below at the sky bar, Level 23. This creates the dramatic stepped form. The glazed skin of the buffer zone to the south façade cantilevers 25m above the top floor level to form a crystalline “blade”.
Fundamental to the success of this scheme was the efficiency of the design. The careful coordination between Structural Engineering and MEP ensured efficiency of design and construction. Innovations such as advanced Fire Engineering delivered a highly efficient core solution whilst the use of passive ‘buffer zones’ and CHP delivered an energy efficient scheme.
2007 CVU Awards
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development