Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
Block 16
Pier 8 Tower
Building
Proposed
Residential
147 m / 482 ft
45
4
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
28 November 2023
On 23 November, Waterfront Shores Corporation announced that development plans for Block 16 and the Pier 8 community had been approved by the Hamilton City...
28 November 2023
On 23 November, Waterfront Shores Corporation announced that development plans for Block 16 and the Pier 8 community had been approved by the Hamilton City...
29 May 2020
A 45-story landmark high rise could rise on Hamilton’s waterfront, if the planets align. Hamilton born, and internationally acclaimed architect Bruce Kuwabara spoke in poetic...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development