You must be a CVU Member to view this resource.
Cheongdam Tower
Building
Competition Entry
Residential
143 m / 469 ft
42
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
04 June 2024
As part of the Seoul City Urban/Architecture Creation/Innovation Design Project contest, J. Mayer H. Architecture has been chosen for its design of the Cheongdam Tower...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development