You must be a CVU Member to view this resource.
Dusk
Republic Tower Three
Building
Completed
2020
Residential
All-Concrete
68 m / 223 ft
16
193
50
Proposed
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
20 March 2018
Geocon’s AU$1 billion (US$770 million) mixed-use precinct in Belconnen, Canberra, has been given the green light by the state government. Set to become Canberra’s largest-ever...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development