You must be a CVU Member to view this resource.
Guangxi Beibu Gulf Bank Headquarters
Building
Canceled
Hotel / Office
402 m / 1,319 ft
75
324
309,000 m² / 3,326,048 ft²
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development