You must be a CVU Member to view this resource.
HAUT
Building
Completed
2022
Residential
Concrete-Timber Composite
BREEAM
73 m / 240 ft
22
1
55
14,500 m² / 156,077 ft²
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
07 April 2022
HAUT takes shape as what could be the Netherlands‘ tallest timber-hybrid residential building designed by British architecture firm Arup. Standing 22 stories tall, the project...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development