You must be a CVU Member to view this resource.
Jiuzhou Bay Tower
Building
Canceled
Hotel / Office
318.5 m / 1,045 ft
64
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
25 September 2020
Skidmore Owings Merrill (SOM) has unveiled plans for a new waterfront neighborhood to be built in Zhuhai, a city in China’s greater bay area located...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development