You must be a CVU Member to view this resource.
Lincoln Yards North Building A.1
Building
Canceled
Office
All-Concrete
68.6 m / 225 ft
15
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
06 March 2019
The US$6 billion Lincoln Yards megadevelopment will include 600 affordable housing units – twice as many as required in a compromise by Sterling Bay as...
06 March 2019
The US$6 billion Lincoln Yards megadevelopment will include 600 affordable housing units – twice as many as required in a compromise by Sterling Bay as...
25 January 2019
A $6 billion development that would transform 55 acres (22 hectares) along the North Branch of the Chicago River is a key step closer to...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development