This project was renovated in 2016 and replaced by Menara KOMTAR (Renovation)
You must be a CVU Member to view this resource.
Menara KOMTAR
Kompleks Tun Abdul Razak
Building
Renovated
1985
Office
All-Concrete
231.7 m / 760 ft
65
71,081 m² / 765,110 ft²
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development