You must be a CVU Member to view this resource.
MLC Building
Building
Completed
1957
Office
All-Steel
59 m / 194 ft
14
42,000 m² / 452,084 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
21 January 2022
A legal battle is underway over the fate of the crumbling heritage-listed MLC Building at North Sydney. Investa Property Group lodged plans to demolish the...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development