This project was renovated in 2021 and replaced by One Post Office Square (Renovation)
You must be a CVU Member to view this resource.
One Post Office Square
Building
Renovated
1981
Office
All-Steel
157 m / 515 ft
41
371
21
83,006 m² / 893,469 ft²
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
24 October 2019
South Station Tower is planned to rise 677 feet (206.4 meters) above South Station, an aging transportation hub in Boston that’s swarmed daily by thousands...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development