You must be a CVU Member to view this resource.
Pier 27
Tower at Pier 27
Building
Completed
2020
Residential
All-Concrete
114.9 m / 377 ft
35
336
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
13 February 2019
Work continues at the site of Citzyen Development Group and Fernbrook Homes’ Tower at Pier 27, where the architectsAlliance-designed condominium tower is rising above Queen’s...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development