You must be a CVU Member to view this resource.
Shanghai IFC South Tower
Building
Completed
2009
Hotel / Office
Concrete-Steel Composite
249.9 m / 820 ft
48
4
45
7 m/s
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Shanghai IFC is a large mixed-use development constituting approximately 400,000 sq m (four million sq ft) of floor area, and includes two Grade A office buildings, a high-end shopping mall, a five-star Ritz-Carlton Hotel and serviced apartments. This combination provides an environment for work, leisure and living for business people and the residents of Shanghai. The site is located within Pudong, connected to the city through direct access from the mall basement to Lujiazui station of the Shanghai Metro Line 2. The future Metro Line 14 Station is integrated within the basement of the development.
The combination of mega column and high level transfer structure, together with the plan and vertical irregularity of the tower, makes these buildings a unique design delivered within an active seismic zone. A performance-based design approach was adopted to determine specific project characteristics and performance requirements. Elasto-plastic analysis was carried out to identify critical elements and the structural performance of different levels of seismic protection specified in the code.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development