You must be a CVU Member to view this resource.
St John's Riverside-Tower 2
Dime
Building
Canceled
Residential
114.4 m / 375 ft
36
2
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
23 January 2019
The developer behind the massive St John’s development in Manchester has scrapped plans for a 52-story skyscraper by SimpsonHaugh & Partners at the heart of...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development