You must be a CVU Member to view this resource.
Straits Row
Building
Completed
2025
Residential
All-Concrete
61.8 m / 203 ft
17
132
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
12 February 2025
Straits Row, an 18-story (54.9-meter) rental building in Printers Row of the South Loop in Chicago, has begun leasing units. Located at 633 South LaSalle...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development