You must be a CVU Member to view this resource.
Tianshan Gate of the World Plots 27 and 28
Tianshan Gate of the World Block A, International Finance Center
Building
Never Completed
Hotel / Office
450 m / 1,476 ft
106
Proposed
Construction Start
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development