You must be a CVU Member to view this resource.
Tower Life Building
Transit Tower, Smith Young Tower
Building
Completed
1929
Residential
Office / Retail
All-Steel
123.1 m / 404 ft
30
234
26,013 m² / 280,002 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Retrofit Start
Retrofit End
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
04 January 2023
The historic 30-story Tower-Life Building will undergo a multi-million dollar transformation starting in 2024. The eight-sided building features a distinctive green-glazed roof. The building had...
04 January 2023
The historic 30-story Tower-Life Building will undergo a multi-million dollar transformation starting in 2024. The eight-sided building features a distinctive green-glazed roof. The building had...
17 August 2022
The historic 1929 Tower Life Building that stands at 123.1 meters (404 ft) has plans to retrofit its office spaces for condominiums and apartments, at...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development