|
RANK
|
Name
|
Status
Completed Architecturally Topped Out Structurally Topped Out Under Construction On Hold Proposed Vision Never Completed Demolished Competition Entry Canceled Proposed Renovation Under Renovation Renovated Under Demolition |
Height
|
|---|---|---|---|
| 1 | AquaVetro Tower | 88 m / 289 ft | |
| 2 | Capital Dock | 79 m / 259 ft | |
| 3 | The EXO | 73 m / 240 ft | |
| 4 | Montevetro Building | 67 m / 220 ft | |
| 5 | Millenium Tower | 63 m / 207 ft | |
| 6 | Liberty Hall | 59.4 m / 195 ft | |
| 7 | Alto Vetro | 51.3 m / 168 ft |
Not enough data. Please change your search criteria.
|
Logo
|
Name
|
Level
|
# of 150m+ buildings
|
|
|---|---|---|---|---|
![]() |
Arup |
Platinum
|
470 | CIV • STRC • WIND • ENVE • PMNG • COST • FAC • FIRE • MEP • VERC |
![]() |
PERI |
Platinum
|
74 | ENGM • MATR |
![]() |
Billings Design Associates, Ltd. |
Silver
|
2 | ENVE |
10 August 2023
One of Dublin’s Unfinished Office Buildings Is Set to Become Apartments
The Sentinel building in Sandyford, Dublin has been abandoned and unused since 2008, despite originally being planned as an office building 15 years ago. On...
13 January 2022
Office Building in Dublin Begins Construction
CTBUH has just received confirmation that a 22-story mixed-use building located in Dublin, is now under construction. The project, which was initially greenlit in April...
25 May 2021
Proposed Dublin High-Rise Denied Planning Permission
Planning permission has been denied to a proposed Dublin high-rise for violating height limits, among other challenges. An Bord Pleanala has refused planning permission for...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development