Renaissance Construction Company

Subsidiary of Ronesans Holding

Visit the Ronesans Holding Member Page
for integrated resources

Ronesans Holding is a member of the CTBUH at the Contributor level.

Visit the CTBUH Membership section to find out more about ways of supporting the Council and the benefits of doing so.

Buildings

Note: All listed data for proposed or under construction buildings is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

  Completed   Architecturally Topped Out   Structurally Topped Out   Under Construction   On Hold   Never Completed   Proposed   Vision   Demolished
ID #   Status Building Name City Height (m) Height (ft) Floors Completed Material Use
12575 1   UCT Lakhta Center St. Petersburg (RU) 462 1,516 87 2019 composite office
118 2   COM Federation Tower Moscow (RU) 373.7 1,226 93 2016 concrete residential / office
233 3   UC NEVA TOWERS 2 Moscow (RU) 345 1,132 79 2020 concrete residential
313 4   UC NEVA TOWERS 1 Moscow (RU) 297 974 65 2020 concrete residential / office
19725 5   COM Evolution Tower Moscow (RU) 246 807 55 2015 concrete office
11601 6   COM Allianz Tower Istanbul (TR) 185.5 609 40 2015 concrete office
17541 7   COM Talan Tower 1 Astana (KZ) 145.6 478 30 2017 concrete/steel office / retail
17311 8   COM Fili Grad - Phase 1-1B Moscow (RU) 108.6 356 31 2016 concrete residential / retail
17310 9   COM Vodnyi - Office Tower Moscow (RU) 104.3 342 28 2015 concrete office / retail
20239 10   COM Fili Grad - Phase 1-1A Moscow (RU) 98.7 324 28 2016 concrete residential
20255 11   COM Vodnyi - Residential Tower 1 Moscow (RU) 90.7 298 26 2016 concrete residential
20256 11   COM Vodnyi - Residential Tower 2 Moscow (RU) 90.7 298 26 2016 concrete residential
20257 11   COM Vodnyi - Residential Tower 3 Moscow (RU) 90.7 298 26 2016 concrete residential
20258 11   COM Vodnyi - Residential Tower 4 Moscow (RU) 90.7 298 26 2016 concrete residential
20259 11   COM Vodnyi - Residential Tower 5 Moscow (RU) 90.7 298 26 2016 concrete residential
28966 16   COM DoubleTree by Hilton Hotel Minsk Minsk (BY) 89.6 294 21 2016 concrete hotel / retail
20243 17   COM Fili Grad - Phase 2-2 Moscow (RU) 86.3 283 24 2017 concrete residential
20244 17   COM Fili Grad - Phase 2-3 Moscow (RU) 86.3 283 24 2017 concrete residential
20245 17   COM Fili Grad - Phase 2-4 Moscow (RU) 86.3 283 24 2017 concrete residential
20246 17   COM Fili Grad - Phase 2-5 Moscow (RU) 86.3 283 24 2017 concrete residential
20247 17   COM Fili Grad - Phase 2-6 Moscow (RU) 86.3 283 24 2017 concrete residential
20242 22   COM Fili Grad - Phase 2-1 Moscow (RU) 75.5 248 21 2017 concrete office
20248 22   COM Fili Grad - Phase 2-7 Moscow (RU) 75.5 248 21 2017 concrete office
20241 24   COM Fili Grad - Phase 1-3 Moscow (RU) 74.8 245 21 2016 concrete residential
20240 25   COM Fili Grad - Phase 1-2 Moscow (RU) 74.6 245 21 2016 concrete residential