You must be a CVU Member to view this resource.
TAIPEI 101
Building
Completed
2004
Office
Composite
LEED Platinum O+M: Existing Buildings
508 m / 1,667 ft
101
5
1839
61
16.83 m/s
198,347 m² / 2,134,989 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Retrofit Start
Retrofit End
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2016 CVU Awards
30 July 2020
History does not want for dizzying fantasies of tall buildings. From the Tower of Babel onwards, humanity has dreamed of ever-more wondrous skyscrapers, whether we...
Standing in the Xinyi District of Taipei, an area known for its financial services and vibrant shopping malls, TAIPEI 101 represents a worldwide precedent for sustainable skyscraper development. It achieved a LEED Platinum certification for Operations and Maintenance in 2011, an impressive feat for a tower of its size and complexity.
The tower rises from its base in a series of eight-story modules that flare outward, evoking the form of a Chinese pagoda. The top of each module houses mechanical floors that accommodate garbage systems, ventilation equipment, water storage, and MEP services. Near the top, a smaller tower caps the structure, forming a pinnacle that has become a familiar sight for the city. The façade of the tower features double-paned green glass curtain walls that are highly reflective and block solar heat gain by 50 percent. Other sustainable features include energy efficient luminaries, custom lighting controls, low-flow water fixtures, and a smart Energy Management and Control System.
TAIPEI 101 contains a 728-ton tuned mass damper (TMD), a large spherical steel pendulum that offsets lateral movements caused by strong winds. The TMD is located in a large multi-story cavity near the top of the tower. This location is ideal for countering overturning forces, a necessary precaution in a typhoon-prone part of the world.
Nearly every aspect of the building’s design is steeped in symbolism. The number “100” symbolizes perfection and “100 plus 1” represents further breakthrough and innovation, and the new beginning. After completion, the building has become a central component of New Year’s celebrations in Taiwan. Every year, all of the tower’s lights are turned off and each of the stacked modules light up in sequential order, counting down the last eight seconds before the New Year, which is followed by a dazzling fireworks display.
2016 CVU Awards
30 July 2020
History does not want for dizzying fantasies of tall buildings. From the Tower of Babel onwards, humanity has dreamed of ever-more wondrous skyscrapers, whether we...
09 August 2019
The tuned mass damper in the Taipei 101 skyscraper moved 15 centimeters due to an earthquake early Thursday, 8 August, according to the building management....
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development