100 West 37th Street
Building
Structurally Topped Out
2026
Residential / Office
All-Concrete
226.5 m / 743 ft
68
2
300
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
23 December 2021
Permits have been filed for a 68-story mixed-use building at 100 West 37th Street in Midtown, Manhattan. Located between Broadway and Sixth Avenue, the lot...