Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
1830 Weston Road
1828-1840 Weston Road
Building
Proposed
Residential
155.7 m / 511 ft
47
3
115
5
36,722 m² / 395,272 ft²
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
17 February 2023
Revitilizations to Toronto's Weston Village neighborhood have been gathering traction through proposals directly adjacent to GO Transit's Weston Station: Weston Park, and 1830 Weston. Earlier in...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development