Ascent
Building
Completed
2022
Residential
Concrete-Timber Composite Over Concrete
LEED Silver
86.6 m / 284 ft
25
259
335
3
45,708 m² / 491,997 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2023 CVU Awards
22 July 2022
On July 20, 2022 New Land Enterprises welcomed the Council on Tall Buildings and Urban Habitat (CTBUH) and the Wisconsin Department of Safety and Professional...
22 July 2022
On July 20, 2022 New Land Enterprises welcomed the Council on Tall Buildings and Urban Habitat (CTBUH) and the Wisconsin Department of Safety and Professional...
17 December 2021
New Land Enterprises and development partner Wiechmann Enterprises celebrate milestone as mass timber construction is structurally topped out. Earlier this week, the final mass timber beams,...
01 September 2020
Construction has started on an unusual downtown Milwaukee apartment tower. The 25-story, 259-unit high-rise is being constructed with a type of mass timber construction called...
01 May 2020
New Land Enterprises will begin pre-leasing apartments in Ascent, a proposed 25-story apartment tower made from mass timber, in the coming days. A brochure will...
30 September 2019
The City of Milwaukee Plan Commission and the Zoning, Neighborhoods and Development Committee have unanimously approved changes to New Land Enterprises’ Ascent residential project that...
15 May 2019
A downtown Milwaukee high-rise has found support from an unlikely source: the United States Department of Agriculture. The department’s Forestry Service division announced this week...
24 January 2019
A downtown Milwaukee apartment high-rise that would use high-grade timber, not steel, for its frame has won Plan Commission approval. The 21-story Ascent would feature...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development