This project is a renovation and replaced Beijing Ding Hao Electronic Market
You must be a CVU Member to view this resource.
Beijing High-Tech Landmark Ding Hao 3 A Block
Building
Completed
2022
Office
All-Concrete
89.9 m / 295 ft
19
5
20
3 m/s
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development