You must be a CVU Member to view this resource.
Cambridge Suites Hotel
Building
Completed
1990
Hotel
74.4 m / 244 ft
21
4
229
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
05 October 2022
The Cambridge Suites Hotel has long been a staple of Toronto's financial district and its long been a distinctive landmark as well, easily picked out from...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development