You must be a CVU Member to view this resource.
Centara Grand
Central World Hotel Bangkok
Building
Completed
2008
Hotel
All-Concrete
235 m / 771 ft
57
23
3.5 m/s
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
11 April 2019
At least two people died and 17 others were injured, some after jumping from the eighth floor, when fire broke out at the CentralWorld shopping...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development