Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
Clinical Support and Research Centre
CSRC
Building
Proposed
2028
Laboratory / Hospital
12
34,400 m² / 370,279 ft²
Proposed
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
22 February 2024
Building design and pre-construction activities are underway at the Clinical Support and Support and Research Centre (CSRC) at the new St. Paul’s Hospital on the...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development