Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
Corinthia Dubai
API Tower
Building
Proposed
2030
Hotel / Residential
All-Concrete
500 m / 1,640 ft
102
Proposed
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
21 October 2025
The exclusive sales partner for the residences at Corinthia Dubai, a landmark development on Sheikh Zayed Road by Dubai General Properties has been named as...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development