You must be a CVU Member to view this resource.
Cristalla
Second + Lenora, Second & Lenora, Crystal Pool
Building
Completed
2005
Residential
All-Concrete
73 m / 240 ft
23
3
197
225
36,982 m² / 398,071 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development