This project is a renovation and replaced Domino Sugar Refinery (Previous)
You must be a CVU Member to view this resource.
Domino Sugar Refinery
Building
Completed
2023
Office
All-Steel
73.2 m / 240 ft
14
1
8
42,735 m² / 459,996 ft²
Proposed
Construction Start
Completed
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development