You must be a CVU Member to view this resource.
Engineering Innovation Hub
Building
Completed
2021
Office / Education
82 m / 269 ft
19
1
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
30 May 2019
Plans for a new AU$280 million (US$353 million) Engineering Innovation Hub are under way with the proposal now on exhibition for Parramatta’s new precinct. The...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development