You must be a CVU Member to view this resource.
Guangzhou CTF Finance Centre
The CTF Guangzhou, Chow Tai Fook Centre, East Tower
Building
Completed
2016
Hotel / Residential / Office
Composite
LEED GOLD
530 m / 1,739 ft
111
5
355
251
1705
86
20 m/s
398,000 m² / 4,284,036 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Peer Review Engineer traditionally comments on the information produced by another party, and to render second opinions, but not to initiate what the design looks like from the start.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
Guangzhou CTF Finance Centre is a mixed-use tower located across from Guangzhou International Finance Center and Canton Tower. The project is adjacent to a large central park and a subterranean retail concourse with transportation interchanges, integrating the project into the city and the wider region.
The design of Guangzhou CTF Finance Centre is derived from the efficient synthesis of its multiple uses. Its form is sculpted at four major transition points: office to residential, residential to hotel, hotel to crown, and crown to sky. Instead of tapering to accommodate the smaller floor plates required for different programs, the tower steps back at four angled parapets. These four setbacks allow for lush sky terraces and dramatic skylights.
Careful attention was paid to the material selection for the tower. Thus, a series of subtle terra cotta mullions line the tower’s elevations. This material played a very important role in both Eastern and Western history, and is also beneficial from an environmental standpoint. The embodied energy of terra cotta is far less than aluminum, glass, or steel. It is self-cleaning and corrosion-resistant. Moreover, it can be produced in many locations in China, reducing the environmental impact of shipping. These terra cotta mullions were designed to project out from the glass on an angle to provide shading on the exterior.
The building employs a number of energy efficient tools to reduce its environmental footprint. In addition to its strong multi-level connections to public transportation, the use of high-efficiency chillers and heat recovery from the water-cooled chiller condensers all contribute to the building’s sustainability.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development