Note: As this project is structurally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
H-1
Rutgers Health New Jersey Innovation Hub, HELIX NJ Building H1, Health & Life Science Exchange Building H1
Building
Structurally Topped Out
2025
Office / Education / Laboratory
All-Steel
77.4 m / 254 ft
14
1
53,326 m² / 573,996 ft²
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
12 September 2024
The HELIX NJ project in New Brunswick reached a major milestone with the placement of the final steel beam atop the 14-story H-1 building, part...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development