You must be a CVU Member to view this resource.
Hanover Buffalo Bayou
Building
Completed
2025
Residential
All-Concrete
137 m / 449 ft
40
2
317
464
74,213 m² / 798,822 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
10 October 2025
A new residential landmark has risen in Houston’s Montrose district with the completion of Hanover Buffalo Bayou, a 40-story apartment high-rise in the heart of...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development