You must be a CVU Member to view this resource.
Hotel Marcel
Armstrong Rubber Company Building, Pirelli Building
Building
Completed
Hotel
Office
All-Concrete
Passive House targeted
36.3 m / 119 ft
7
165
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
24 June 2022
Architecture studio Becker + Becker has converted a 1970s brutalist building in New Haven, designed by Hungarian-American architect Marcel Breuer, into a Passive House hotel. Connecticut-based...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development