Hyde Park Labs
Harper Court Phase 2
Building
Completed
2025
Laboratory / Office
Concrete-Steel Composite Over Concrete-Steel Composite Over Concrete
65.9 m / 216 ft
14
1
125
27,942 m² / 300,765 ft²
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
06 October 2025
On September 16, the University of Chicago marked the opening of Hyde Park Labs, a 300,000-square-foot (27,871-square-meter) commercial laboratory designed to accelerate science and innovation....
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development