You must be a CVU Member to view this resource.
Jumeirah Marsa Al Arab
Building
Completed
2025
Serviced Apartments / Hotel
All-Concrete
17
82
386
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
13 January 2022
Inspired by a futuristic superyacht, a new hotel resort in Dubai, Jumeirah Marsa Al Arab, has the silhouette of a giant ship. Upon completion, it...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development