This project was renovated in 2016 and replaced by LondonHouse Chicago
You must be a CVU Member to view this resource.
London Guarantee Building
London Guaranty & Accident Building, Stone Container Building, Crain Communications Building
Building
Renovated
1923
Office
All-Steel
102.9 m / 338 ft
22
8
28,335 m² / 304,995 ft²
Construction Start
Completed
Retrofit End
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development