This project was redesigned in 1950 and replaced by Metropolitan Life North Building
You must be a CVU Member to view this resource.
Metropolitan Life North Annex
Building
Never Completed
Office
All-Steel
100
30
Proposed
Construction Start
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Originally planned to be a 100-storey building, but construction was halted in 1933 at the 29th floor, resulting in the existing building: Metropolitan Life North Building.
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development