You must be a CVU Member to view this resource.
Moxy Los Angeles Downtown / AC Hotel Los Angeles Downtown
Fig + Pico Tower 1
Building
Completed
2023
Hotel
All-Concrete
141.8 m / 465 ft
38
727
55,742 m² / 600,002 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
10 September 2021
National real estate investor and developer Lightstone announced the topping out of construction on the dual-branded Moxy Los Angeles Downtown and AC Hotel Los Angeles...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development